There is already a wide range of biogas plants and concepts on the market. Not all of these represent ideal solutions in terms of economy and long service life. New economic conditions for biogas plants make it essential to improve the quality of biogas production. To this end, the process stability is extremely important. In the Centrigas® system, the independent processes have been technically separated: preliminary acidification, methanisation and subsequent gassing take place under physical separation, and can therefore be controlled more specifically.



The circulation of the reactor contents is very important to ensure thorough mixing, removal of floating matter and the suppression of sedimentation. In daily practice, motor powered agitators have frequently proven to be susceptible to problems.
The circulation within Centrigas® systems takes place completely without any mechanical parts in the reactor; it is maintenance-free and extremely efficient.
Centrigas
New development
Technical characteristics
bin-englvers017013.gif bin-englvers017012.gif bin-englvers017011.gif bin-englvers017010.gif
Sectional view of a Centrigas system
(For photos move the mouse about the picture)

Legend to system sectional view:

:
New development of the Centrigas® system

Technical characteristics

csn-vorlbeh.gif cs-bhkw.gif csn-ferm.gif csn-heiz-n.gif cs-substr22.gif csn-gafa-kl.gif csn-plane.gif

  1  regulated substrate addition
  2  pre-acidification with FFF process
  3  circulation of pre-acidification

 4  rock and sand trap
  5  filler pump
  6  pre- acidification heater
  7  fermenter filling with a heat exchanger
  8  fermenter
  9  fermenter heater
10  subsequent gassing / storage
11  gas tank
12  gas membrane
13  gas membrane filling measurement
14  intermediate insulation
15  fan for roof utilization
16  storm and UV resistant all-weather cover
17  central control unit
18  pressureless torch
19  combined heat and power station

20 power supply
21 heat energy distribution
22 substrate removal
23 drainage
24 exterior insulation

 

logotropfrahm.gif
BIOLAK GROUP